| KFP: Clean Development Mechanism (CDM) |
Scope at all India Level:
By implementing KFP at all India level at one time cost of just Rs 2,250* billion (2,25,000 Crore), we can harvest 800 billion cu mtr (BCM) rainwater underground.
This system will save 150 billion Kwh power required for supplying 500 BCM irrigation water.
Thus the system cost can be recovered within 4 years by savings in cost of irrigation power generation alone.
| No. of KFP at National Level |
100 million |
| One time Investment for KFP structures |
Rs 2250* billion |
Annual rainwater harvested (BCM=Billion Cubic Mtr)
|
800 BCM
(Green water: 500 BCM for Food production
+ Blue water: 300 BCM for Groundwater) |
| Annual Power saving in irrigation will be |
150 billion Kwh (worth Rs 600 billion) |
Payback period
(by savings in cost of ‘Irrigation Power Generation’ alone) |
4 years |
| Annual Carbon credit earning potential by KFP in India |
160.5 million ton |
Annual Foreign Exchange earning
(if KFP classifies as CDM) |
2.8 billion $ (Rs 14000 Crore) |
| Annual Saving of Soil erosion |
2-6 billion tons |
| Life of KFP structure |
200 years (Minimum) |
------------------------------------------------------------------------
* Cost of murum (porous soil) extra, wherever required
|
A revolutionary and scientific way to rekindle Green Revolution!
KFP rainwater harvesting technology has the potential of making the whole India water scarcity free - a true Sujalam Sufalam Bharat.
|
|
|